Engineering and construction execution · Partial fit-out
JLL - PepsiCo Peru project
Client: JLL - PepsiCo Peru project · Industrial sector · 2025–2026
Integrated construction, conditioning, and implementation of corporate and operational spaces: laboratory, administrative offices, sanitation tunnel, and human-resources warehouse, with sintered-stone, RH melamine, and stainless-steel furniture, high-efficiency LED lighting, and corporate-identity elements.
View completed work
Architecture & civil works: Custom modular metal container, reinforced and fire-rated drywall, special ceilings, porcelain, ceramic, and vinyl flooring, melamine, aluminum, glass, and galvanized-steel doors, and automatic sliding doors.
Steel structures: Structural steel, supports, and special metal elements.
Electrical installations: Power and electrical points, panels and protection, luminaires, LED panels and strips.
Plumbing installations: Cold-water and drainage networks, stainless-steel sinks, and faucets.
HVAC: HVAC system and mini-split units.
Electronic security: Security and intrusion-detection system.
Specialized furniture: Sintered-stone and granite countertops, stainless steel, and metal shelving.
Branding and signage: Vinyl graphics, environmental graphics, signage, and visual identity.
Outcome
Operational handover in 2 months and 154 m² impacted, under coordinated planning across the disciplines and contractors involved, without interrupting operations.